info@bluecoremarine.com
Blue Core Marine Blue Core Marine Works

PJ006 – MNoQ South Carpark (Outfall, Corniche, Al Doha)

Installed HDPE intake pipeline and leveling layer at the Corniche outfall with concrete placement and quality documentation.

Challenge

Urban waterfront constraints and tide windows limited installation time per day.

Approach

Prefabricated pipe sections, tide‑synchronized lifts, and diver‑assisted alignments over surveyed leveling layers.

Outcome

Outfall works completed to specification with stable bedding and verified line/level.