Private Yacht Underwater Services (4 Units)
Qatar • 02/2017-03/2017
IMCA, ADC, IDSSC Certified • Serving Qatar, and GCC
Installed HDPE intake pipeline and leveling layer at the Corniche outfall with concrete placement and quality documentation.
Urban waterfront constraints and tide windows limited installation time per day.
Prefabricated pipe sections, tide‑synchronized lifts, and diver‑assisted alignments over surveyed leveling layers.
Outfall works completed to specification with stable bedding and verified line/level.